JayConstruction  

Current and Completed School Construction Projects at John Jay

Welcome to the John Jay Construction Page.
Take a moment and read about the different construction projects completed and currently taking place at John Jay.
Come back and visit us again to see new updates and status on current projects.

Technology Education Lab      

 

The Department of Technology renovated a traditional Transportation Technology lab used primarily for Transportation Systems and Materials & Fabrication (Metals) into two spaces.  One space is primarily used for instruction, research, and design. Students utilize computer programs such as Autodesk CAD, Inventor, Revit, and Adobe Photoshop for research and design purposes. The other space is a fabrication lab. Students utilize this lab to bring their computer generated models to life by using traditional fabrication tools, resources, and processes.

 
       
Knicks Way      
 

The roadway which extends from the John Jay parking lot to the athletic complex was paved during Summer 2007.  Before paving, this road consisted of large pot holes, uneven grading, mud puddles, and no clearly marked parking spaces. Now busses, students, parents, and spectators have a safe and direct route to the athletic complex.

 
 
Outdoor Athletics Restroom
Currently an outdoor athletic restroom is being constructed. This new restroom will be located between the football and baseball field.  After completion, parents, athletes, and spectators will no longer have to travel to a designated school building entrance to use a bathroom facility.  The new outdoor bathroom will have a partition for the storage of athletic equipment.

Approved Future Construction Projects

School Restrooms
Restroom facilities will be renovated in the English and Foreign Language wings.  Sewer gas odors will be addressed during the renovation process for these new restrooms. For more information regarding these odors please view this letter.

Four New Classrooms
Four additional classrooms will be constructed in a new wing which will extend from the existing Math and English wing. 

Locker Rooms
Both Boys and Girls lockers will be renovated.  These renovations will include: new bathrooms, new showers, and new lockers.